Lotte World Tower
On 4 April 2017, the Council on Tall Buildings and Urban Habitat (CTBUH) officially acknowledged the newly-completed Lotte World Tower as the fifth tallest building in the world.
Located in Seoul, South Korea, the sleek, tapered supertall tower measures 554.5 m (1,819 ft), pushing Kuala Lumpur’s Petronas Twin Towers (at 452 m) out of the Top 10 list for the first time since they were completed in 1998.
Built with the 10-storey Lotte World Mall at its base, which opened in 2014, the tower is a slender cone with gently-curved convex sides. The architects Kohn Pedersen Fox Associates used pale-coloured glass for the exterior, drawing inspiration from Korean ceramics, porcelain and calligraphy.
Originally granted permission to start construction in November 2010, work actually began in March 2011.
The 123-storey tower contains a variety of functions, including retail, offices, luxury hotel, concert hall with 2,000 seating capacity, aquarium, and cinema. It also boasts the world’s highest glass-bottomed observation deck, which visitors can walk across at 500 m (1,640 ft) above ground.
The roof structure is 120 m-high and is constructed using 12 m-high steel counterparts, each weighing 20 tons. It is resistant to earthquakes of up to 9 on the Richter scale, and wind speeds of up to 80 m/s.
Other notable features include the world’s highest swimming pool in a building, on the 85th floor, and the world’s fastest elevator, capable of taking people to the top in just 60 seconds.
[edit] Find out more
[edit] Related articles on Designing Buildings Wiki
Featured articles and news
Licensing construction in the UK
As the latest report and proposal to licence builders reaches Parliament.
Building Safety Alliance golden thread guidance
Extensive excel checklist of information with guidance document freely accessible.
Fair Payment Code and other payment initiatives
For fair and late payments, need to work together to add value.
Pre-planning delivery programmes and delay penalties
Proposed for housebuilders in government reform: Speeding Up Build Out.
High street health: converting a building for healthcare uses
The benefits of health centres acting as new anchor sites in the high street.
The Remarkable Pinwill Sisters: from ‘lady woodcarvers’ to professionals. Book review.
Skills gap and investment returns on apprenticeships
ECA welcomes new reports from JTL Training and The Electrotechnical Skills Partnership.
Committee report criticises UK retrofit schemes
CIOB responds to UK’s Energy Security and Net Zero Committee report.
Design and construction industry podcasts
Professional development, practice, the pandemic, platforms and podcasts. Have we missed anything?
C20 Society; Buildings at Risk List 2025
10 more buildings published with updates on the past decade of buildings featured.
Boiler Upgrade Scheme and certifications consultation
Summary of government consultation, closing 11 June 2025.
Deputy editor of AT, Tim Fraser, discusses the newly formed society with its current chair, Chris Halligan MCIAT.
Barratt Lo-E passivhaus standard homes planned enmasse
With an initial 728 Lo-E homes across two sites and many more planned for the future.
Government urged to uphold Warm Homes commitment
ECA and industry bodies write to Government concerning its 13.2 billion Warm Homes manifesto commitment.
From project managers to rising stars, sustainability pioneers and more.
Places of Worship in Britain and Ireland, 1929-1990. Book review.